Napa River Maintenance Dredging
Performed on an Annual Basis
Napa River Maintenance Dredging
Location: Downtown Napa South of 1st Street Bridge
Owner: City of Napa
Contact: Ahtna Construction
Description:
Lind Marine provided clamshell dredging and removal of 20,000+ cubic yards of dredge material from the Napa River adjacent to downtown businesses South of the 1st Street Bridge. Dredging was accomplished utilizing a Senneboggen material re-handler aboard a 120 x 40 Spud barge. Material was transported to the former Napa Pipe Site. Offloading was accomplished using the Dredge Gretajean LIND’s 1200MH eCrane mounted to a 120 x 54 Spud barge.