Port of Stockton Pile Driving

Port of Stockton Pile Driving
NOVEMBER 2018

Lind Marine driving piling at the Port of Stockton Nov, 29 2018. The piles are 100’ long, 44” diameter, 1.44” wall, 75,000 pounds each and had to be driven to exact tolerances. Very difficult project, and the crew did a perfect job, as usual.